Thursday, 22 November 2012

Production - 2nd filming day from my perspective

In the second day of filming we were a bit more prepared and it flowed more naturally. I have brought a big torch to provide some light at night shots. We didn't have any problems during the production, but later when watching our footage I was not so happy. One of our base tracks is walking in the street and because the shots were hand held and very close to the artist it looked very shaky and it didn't look like he was walking. I also think that this day we haven't filmed everything we were meant to film, like for example shots of people walking or shots of London icons (Big Ben, London Eye) or even our main chorus shot. I was also not so happy with the framing, and Nimar's performance at some of the base tracks wasn't particularly touchy, he looked very serious. We definitely had to reshoot, but we can still use some of the shots that worked well. As for example, in some of the shots of Nimar walking with the guitar there are parts in which the shot looks quite steady and we can use just a few seconds from that.


No comments:

Post a Comment