Day 3
Today we had to re-film our base tracks we filmed previously becuase the footage was to shaky becuase it was hand held.
Locations: waterloo , westminister, Southbank and london bridge
Props: Blue and grey cardighan and blackberry phone
Equipment: Hand held tripod,tripod and jvc camera
Objecive: Re-film day 2 base tracks ad film third base track. film some extra walking scenes and scenes of iconic places
How did it go?
All filming went well and managed to film all parts we intended. Because of already expericne of filming the second base track it was easier to film and the hand held tripod is much more better to use when moving is involved in filming.
Promblems:
Problem- we travelled all the way to London eye and found that the tripod we brought was broken and we needed it to film a short clip with big ben. to resolve the problem we got celetape from mc donalds and taped the tripod so we can use it which ended up working very well
Filmed the Third base track on a building outside stairway off waterloo bridge as we was not abled to get a hold of a balcony. It was very dark this balcony so the torch heped us to make the filming a little lighter light. We were told we might be told to leave by security but we wasn’t. After filming 3 to four times the battery finished and we used first battery in the morning however we manage to film a few full shots of our third planned base track
Extras: Car driving passed and more walking throughcity
No comments:
Post a Comment